Hazard identification
Record the activity, the hazard, the people exposed and the situation observed, using a structured template.
Risk assessment
Assess hazards with a method your team recognises. Record the risk level, the controls and the person responsible, then route the assessment for approval and create actions where the risk needs work.
Risk, connected
Give HSE teams a repeatable method and give managers a clear view of the risks and controls recorded for each activity.
Record the activity, the hazard, the people exposed and the situation observed, using a structured template.
Use a 5×5 matrix or configure severity and likelihood labels to match your methodology and risk bands.
Record probability, severity and risk level alongside the prevention and control measures for each hazard.
Classify controls from elimination and substitution through engineering, organisation and PPE, and assign a control owner.
Route the assessment for approval and keep the decision, reviewer and signature with the record.
Review assessments and risk levels by site and activity, and generate a PDF or Word report from the completed record.
A method people can repeat
A team assesses a maintenance activity. Each hazard is recorded with the people exposed, the probability, the severity and the resulting risk level.
The control measures are classified, assigned to an owner and given a due date. The assessment is approved and kept with the site record, so the method is consistent the next time the activity is reviewed.

The risk lifecycle
A repeatable method for HSE teams, with a clear record for operations and review.
Define the site, activity, assessor and the boundary of the assessment.
Record each hazard, the people exposed and the situation observed.
Score probability and severity, set the risk level and record the controls.
Assign control owners and dates, approve the assessment and create actions where needed.
FAQ
Yes. The severity and likelihood labels and the matrix data are configurable, so the assessment can follow your current method.
Yes. Controls can be classified as elimination, substitution, engineering, organisational measures or PPE.
Yes. A field such as risk level can be configured to show an action control. A user can create a follow-up action with an owner and due date, and controls can also carry an owner and due date.
Yes. Risk assessments use the approval and signature process, so the reviewer and decision are retained with the assessment.
Yes. Assessments are recorded against a site, and permissions can limit each team to the sites it manages.
Yes. Completed risk assessments can be exported as PDF or Word reports and reviewed alongside the site record.
Bring one of your own checklists, permits or risk assessments. We will show you how it works in InspecOps in 30 minutes.